Good progress at Berthon’s

February 23, 2018

Berthon/Simon Rogier is waiting for some warmer weather to finish the installation of the keel.

IRC will therafter soon measure the overhangs, just to be safe and stay honest.


primed keel stub and prepped ballast just after dry fitting


Structural glue between keel stub and ballast spilling out as boat comes down. The fit between Winsome and the ballast will be perfect


Laser line running perfectky down the underside if Winsome and the new ballast


Same laser shot taken showing the trailing edge of rudder in the foreground

The cold weather may cause some delay, but Berthon feels safe for Winsome to reach the RORC Easter Regatta in time.

Post by Harry Heijst | February 23, 2018 |

1 Comment

  1. ziet er flitsend uit Harry!
    Zou Windsome ook sneller zijn?
    Groet
    Boblp

    by Bob jol757 | 28 Feb 2018 | 11:02